Streets Division

Responsibilities


The Streets Division is responsible for the maintenance and repair of Edina's more than 230 miles of city streets, public parking lots, street signs and pavement markings.
  1. 1
  2. 2
This responsibility is divided into the bituminous (blacktop) streets and concrete street crews. Approximately 80% of Edina's streets are paved with a flexible bituminous pavement. The pothole repairs, street sweeping, crack sealing, majority of overlay projects and sealcoating are performed by the bituminous street crews. The concrete crews handle the concrete street repairs, concrete curb and gutter and sidewalk replacements.